The Member of Legislative Assembly for The Period from 2008 to 2013

Assurances

Achievements

Assured to make KR constituency borewell-less  by providing proper water supply as a permanent measure

Cauvery water is being supplied from Hongalli and Melapura.  From November 2012, treated water from Kabini  is being supplied.  Almost all bore wells have been dispensed with.  12728 new water connections have been provided and remaining work is in progress

Developments in educational field, renovation of schools and construction of new buildings for schools

New buildings have been constructed for Govt junior college and first grade college in  Kuvempunagar
Additional class rooms have been constructed in eight govt schools.
Construction work of the Building for the first grade college in Siddarthanagar is in progress
Improved the position of SSLC result in  the district from 72% to 86% during the last 4  ½ years by arranging special training programme.
150 students belonging to poor family are provided with Uniform and text books free of cost apart from bearing their fees every year.
28000 students of all primary and middle  schools in the KR Constituency are being distributed with books and writing materials free of cost.

Improvements to the Roads

Development of major roads and asphalting of all  interior roads   has been achieved.
New Kantharaj urs road, Adichunchanagiri road, JLB road, St Thomas school Road, Srirampura Road, Akkamahadevi Road and Lalithamahal roads have been widened.   Work of converting 8 KMs  Roads to four lane is in progress. 
Out of the 100 crore special packaged from the Chief Minister’s grant, a total of 80 KMs roads have been improved of which 42 KMs belonging to MUDA and 23.5 KMs belonging to MCC .
There is a proposal to up grade Chamaraja double road to concrete road of international standard.

Proper distribution of Ration cards

87 fair price shops are functioning. 595 Ration cards under  Anthyodaya scheme, 26,303 under BPL and 24,400 under APL  totaling  51,298 ration cards have been issued by clearing all on line applications. 

Face lifting /development of Temples

A sum of Rs. 20,09,715- has been spent on face lifting/development of various temples in the constitution.
Proposal /estimates for a sum of 3.5 crores for various development works for the temples in the palace complex has been submitted to Govt for approval.

Making the constituency slum free

Completing the ASHRAYA scheme

With the aim of making the constituency slum free, 1010 houses have been got constructed under NURM scheme and allotted to beneficiaries.
“Mysore-City of own houses” scheme has been approved by the Govt and action has been taken in the first phase to construct 12000 houses for deserving beneficiaries of the constituency.  A total of 34,000 families from all the three constituencies of the  city have been identified for this project.  The location has been identified and work is in progress.

“Health is wealth” -  to implement all the schemes of the Govt.

PHC Jayanagara has been upgraded to 30 bed hospital
Introduced ‘Vajapayee Arogya shri’ scheme for those under below poverty line.
“ Generic medical shop” has been opened at KR Hospital to facilitate the poor patients to get the medicines at less than 50% rate.
Modernized various units of K R Hospital and Jayadeva cardiology centre has been opened at KR Hospital premises.
In addition to the existing ambulance  Services ,  2 more 24 hours free ambulance service has been provided to the constituency.

‘CLEAN MYSORE’
To ensure complete benefit of various schemes of waste disposal to the people of the constituency

Arrangements have been made to collect waste from all house holds of the constituency every day besides placing garbage tanks at convenient  locations.
Convenient Location measuring 5 acres  at survey no. 308, 309 and 317 of Kesare has been identified for shifting Excel plant.

Improving greenery in the constituency

20,000 saplings have been planted on the road sides in the constituency besides distributing 3,00,000 flowering plants to house holds.

Establishing service centres  of all public service sectors/Dept

“Mysore-one” service centres are functioning in all zonal offices of MCC.

Extending all Govt benefits to sthree shakthi and sthree deepa organisations functioning in the constituency

Grant from Local area fund of the MLA has been provided to Padmashree mahila jain samaj building of Ist ward, Arya bhagini seva samaja building in 3rd ward, sharada niketan mahila hostel in 6th ward, mahila seva niketan kof 18th ward, sthree shakthi samudaya bhavan in 63rd ward, kasturaba sthree shakthi samidaya bhavan in 63rd ward, and 65th ward.

Introducing ‘Janaspandana’ and “Janajagruthi” vedike

Action has been taken to solve the problems in all wards by undertaking padayathra along with officers of concerned department.
“ Citizen charter “ has been introduced for the first time in the state.
Introduced “Sakaala” for the first time in the nation and Mysore is placed 12th in this project.
“Benefit mela “ of all Govt facilities was organized by bringing benefit schemes of various departments under one roof.
For speedy and proper implementation of various citizen service schemes, periodic face to face meeting is being held in the constituency.
14218 out of 17277 applications received in the office of the MLA have been disposed.

Arranging old age pension and bus pass

Old age pension has  been sanctioned to 772 senior citizens.
Senior citizen identity cards have been got issued to 8423 beneficiaries free of cost.
House tax has been got reduced to 50% by an amendment to the relevant act  from 2013-14 for those  serving in army and to Ex servicemen.

Development to Parks
Improving the parks and developing new parks

8 new parks have been constructed and 20 parks have been improved.
Development work at Madhuvana park is under progress.
Grants have been provided from the local area fund of the MLA to improve the following parks;
Yesdi park in Nazarabad
Manuvana park in 3rd ward
Parks in 11 cross and 12 cross in Ramanuja Road-4th ward
Kuvempu park in 18th ward
Park in Ist main in 6th ward
Park in 14th cross in 8th ward
Vishwadatta park in 15th ward
Park in front of Gopalaswamy shishu vihar in 13th ward
Subramanya temple park in Devaiana hundi in 13th ward.
Park behind Kamakshi Hospital on 4th Main TK Layout in 22nd ward.

Free Library/reading room
Providing and maintaining free library and reading room in various centres

Construction of public library behind Sunnadakeri market in 2nd ward
Construction of library in 15th ward
Construction of library in the park in 3rd stage KHB colony in 17th ward.
Construction of library in LIG 4th stage in 17th ward

Transport facility

Mysore city Bus stand and Kuvempunagar Bus depot have been modernized and dedicated to public service
Electronic display board showing the timings has been provide3d to 30 bus stops under intelligent transport system for the first time in India

Palace

Sound and light facility has been provided to Mysore Palace.  Renovation to palace and temples in Place complex is under progress

Aradhana

Under Aradhana scheme, 20,09,715 has been spent for providing basic facilities in various temples

K S I C

Centenary building has been constructed on the occasion of centenary celebrations of KSIC.

Zoo Garden`

Various development works have been completed in the Zoo garden as also construction of Aquarium.  Work of 2nd stage is under progress.

Electricity

High mast lights have been provided at 26 important locations
Customer care centre has been started at Kuvempunagar

Social security schemes

Rs. 2 crores grant has been provided to street vendors co operative society
772 sandya suraksha pensions, 453 destitute widow pensions, and 96 physically handicapped pensions have been got sanctioned through the office of the MLA.

Local area development fund of the MLA

A sum of Rs. 1,66,00,000 towards public buildings, Rs. 2,38,00,000 towards community schemes and Rs. 74,44,572- towards education have been spent from the Local area development fund of the MLA

Construction of 250 mm x 350 mm diameter man holes in ward no. 2, 3, 4 and 12 has been completed.